Completed Projects

Shuqaiq Satellite Desalination Plant Project
Project No. SDP025
Client:
SWCC / Rawafid
Location:
Shuqaiq, KSA
Project Start:
Dec 2019
Project Duration:
12 Months
Date of Completion:
Dec 2020
Average Manpower:
208 workers

Project Scope

  • Turnkey civil, architectural, and steel structure procurement and installation work for the Shuqaiq Satellite Desalination Plant Project.
  • Works included Sea Water Intake & Outfall, Pretreatment Area & Wastewater Area, RO Building, Electrical, and Control Building, Post Treatment Area, and Chemical Storage Building.
  • Scope included 56,531 m3 excavation, 92,370 m3 filling, and 12,932 m³ concrete work.
Neom Desalination Plant Project , Duba, KSA
Project No. DSD024
Client:
SWCC / Metito Saudi Limited
Location:
Duba, KSA
Project Start:
Feb 2019
Project Duration:
13 Months
Date of Completion:
May 2020
Average Manpower:
109 workers

Project Scope

  • Turnkey civil and architectural works for the Duba Water esalination Plant Project.
  • Works included Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake Pump Station, Product Water Storage, Neutralization Tank, and Guard House, the total area of 45,468 m2.
  • Scope included 17,558 m3 Concrete, 2,016-ton Reinforcing Bar work.
Petro Rabigh Clean Fuel / Sulphur Recovery Unit
Project No. PCF021
Client:
Saudi ARAMCO / Kinetics Technology Tecnimont Arabia Ltd.
Location:
Rabigh, KSA
Project Start:
July 2017
Project Duration:
21 months
Date of Completion:
May 2019
Average Manpower:
120 workers

Project Scope

  • Turnkey construction works for the PETRO RABIGH CFP/ SRU Project
  • Works included R225 – CFP (Clean Fuel Unit), R311 – SRU 3 (Sulphur Recovery Unit), SS27 (Electrical substation), and PIB27 (Process Interface Room) packages.
  • Scope included 22,000 m3 structural concrete, 3 km U/G FRP Piping Works, and 3 buildings works.
Rabigh II Refining and Petrochemical Project
Project No. SNA019
Client:
Saudi ARAMCO / SAIPEM
Location:
Rabigh, KSA
Project Start:
Sep 2016
Project Duration:
6 months
Date of Completion:
Mar 2017
Average Manpower:
80 workers

Project Scope

  • Miscellaneous excavation, backfilling, reinforced concrete, steel, equipment installation, process piping, and instrumentation works.
  • Scope included 10.000 m3 excavation, 985 m³ concrete, 12-ton chequered plate cover, 12.570 m2 protective coating works.
East Dammam Aramco Housing Project
Project No. DMH018
Client:
Saudi ARAMCO / BAYTUR
Location:
Dammam, KSA
Project Start:
Nov 2015
Project Duration:
17 Months
Date of Completion:
Mar 2017
Average Manpower:
400 workers

Project Scope

  • Lump-sum MEP, Finishing and Landscaping Works of 218 premium villas for Saudi Aramco management personnel.
  • Scope included 104,000 m2 closed area.
Yanbu Power and Desalination Plant
Project No. YPR016
Client:
SWCC / Samsung Engineering
Location:
Yanbu, KSA
Project Start:
May 2015
Project Duration:
17 Months
Date of Completion:
Sep 2016
Average Manpower:
580 workers

Project Scope

  • Civil works for Aeration Basin, Mixing Basin, Bypass Basin, discharge Basin, pipe racks, and buildings.
  • Scope included 350,000 m3 excavation, 93,000 m3 concrete, 10,000-ton rebar work.
Petro Rabigh II Initial Start-Up Team Accommodation Project
Project No. PRB008A
Client:
Saudi ARAMCO, SUMITOMO & BAYTUR
Location:
Rabigh, KSA
Project Start:
July 2015
Project Duration:
9 Months
Date of Completion:
Mar 2016
Average Manpower:
200 workers

Project Scope

  • Construction of Camp Facilities, 200 Bachelor Accommodation Units, and 48 Family Residence Units, including all MEP utilities and infrastructure work, a total of 108,000 m2 covered area.
  • Scope included structural, mechanical, electrical, plumbing works and landscaping.
Petro Rabigh II Blast Proof Manufacturing Buildings Project
Project No. PRB008B
Client:
Saudi ARAMCO & SUMITOMO/BAYTUR
Location:
Rabigh, KSA
Project Start:
Oct 2015
Project Duration:
32 months
Date of Completion:
May 2018
Average Manpower:
83 workers

Project Scope

  • Works included construction of blast-proof buildings, including all, work civil, structural, MEP works, and external utility tie-ins.
  • Scope included Polymer Satellite Maintenance Office Building (828 m2), U&OM Satellite Maintenance Office Building (828 m2), Refinery Satellite Maintenance Office Building (828 m2), and Monomer Satellite Maintenance Office Building (996 m2), Monomer Satellite Maintenance Office Building II (790 m2), Polymer Satellite maintenance Office Building II (790 m2)
Petro Rabigh II Non-Process Buildings Construction Project
Project No. PRB008B
Client:
Saudi ARAMCO & SUMITOMO/BAYTUR
Location:
Rabigh, KSA
Project Start:
Jan 2012
Project Duration:
83 months
Date of Completion:
Dec 2018
Average Manpower:
800 workers

Project Scope

  • Turnkey construction and facility maintenance work for the Petro Rabigh II Non-Process Buildings facilities, a total of 76,000 m2.
  • Scope included supply and construction of Administration Building, Product Warehouse Building, client camp, and catering facilities for further construction of Petro Rabigh II, client offices, additional buildings for maintenance, laboratory, and canteen buildings inside the existing PRB facilities, renovation of main mess hall facilities for Petro Rabigh, operation, and maintenance of all facilities for 1500 days.
  • The original scope of the contract has been extended.
Project No. HHR006
Client:
Saudi Railways / Yapı Merkez
Location:
Madinah, KSA
Project Start:
Dec 2011
Project Duration:
12 Months
Dec 2012
May 2019
Average Manpower:
250 workers

Project Scope

  • Civil works of the Madinah Station of the Harmain High-Speed Railway.
  • Scope included 120,000 m3 concrete, 11,300 tons reinforcement,, 169,300 m2 formworks works with supply.
King Khalid University Conference Hall Building
Project No. KKU004
Client:
Ministry of Education / BAYTUR
Location:
Abha, KSA
Project Start:
Apr 2012
Project Duration:
17 months
Date of Completion:
Aug 2013
Average Manpower:
100 workers

Project Scope

  • Civil works of the 28,000 m3 conference hall building in King Khalid University
  • The project, Phase 3 Works.
  • Scope included 10,700 m3 concrete and 1,200 tons of reinforcement works.
King Khalid University General Administration Building
Project No. KKU004
Client:
Ministry of Education / BAYTUR
Location:
Abha, KSA
Project Start:
Apr 2012
Project Duration:
16 months
Date of Completion:
Aug 2013
Average Manpower:
70 workers

Project Scope

  • Civil works of the 32,000 m2 General Administration Building in King Khalid University Project, Phase 3 Works.
  • Scope included 15,300 m3 concrete, 1,700 tons reinforcement, and precast slabs installation works.
Jabal Omar H12, H13A, H13B and H13C Towers Project
Project No. JOD003
Client:
Jabal Omar Development Co. / NESMA
Location:
Makkah, KSA
Project Start:
Feb 2011
Project Duration:
26 months
Date of Completion:
Mar 2013
Average Manpower:
300 workers

Project Scope

  • Civil works of the 34 floors, 58,000 m2 hotel towers in Jabal Omar Project.
  • Scope included 36,000 m3 concrete and 5,200 tons of reinforcement work.
King Saud University Agricultural Engineering Faculty Building
Project No. KSU002
Client:
Binladin / Renaissance Construction KSA
Location:
Riyadh, KSA
Project Start:
Mar 2011
Project Duration:
6 Months
Date of Completion:
Sept 2011
Average Manpower:
75 workers

Project Scope

  • Civil works of the 3 floors, 12,000 m2 faculty building.
  • Scope included 2,700 m3 concrete and 400 tons of reinforcement works.
Princess Noura University Family and Consumer Sciences Faculty Building
Project No. PNU001
Client:
Saudi Oger / Renaissance Construction KSA
Location:
Riyadh, KSA
Project Start:
Jul 2011
Project Duration:
7 months
Date of Completion:
Feb 2012
Average Manpower:
150 workers

Project Scope

  • Civil works of the 80,000 m2 faculty building.
Hawiyah Unayzah Gas Reservoir Storage Project
Project No. HGR026
Client:
Samsung, Saudi Aramco
Location:
Hawiyah, KSA
Project Start:
Mar 2020
Project Duration:
22 Months
Date of Completion:
Apr 2022
Average Manpower:
400 workers

Project Scope

  • Turnkey Earthworks, Civil, Architectural, Building RC & HVAC Works.
  • Works include All Reinforced Civil Concrete, Road & Asphalt Paving Works for Phase-1 areas.
  • Scope included 100,000 m3 excavation, 500,000 m3 filling and 30,000 m³ concrete work.